Project: CH750-SR   -  
            Listing for Category : wings
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

Dec 03, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Wing complete.


 
Nov 16, 2021     Pilot Side Wing - (2 hours)       Category: Wings
More wing root work. The sheet metal is now fully in place. It will not be riveted in until final assembly when the wings have been attached to the fuselage, the controls rigged, and all connections tested (including fuel lines).


 
Nov 08, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Wing root sheet metal work.


 
Oct 24, 2021     Pilot Side Wing - (2.5 hours)       Category: Wings
Connector to plug into AeroLED wingtip lights.


 
Oct 23, 2021     Fuel Line - (3 hours)       Category: Wings
Used Earl's tooling to fabricate braided steel fuel lines using Earl's AN fittings. Used proper tools (line cutter and fitting clamp). Leak test with 100LL to follow.


 
Oct 20, 2021     Build and Install Fuel Tank - (4 hours)       Category: Wings
Wing was a lot easier the second time; should be done with this wing soon. The deeper consideration, basic learning, tool and part acquisition was on the first wing. This one is all about refinement and getting better at doing something the second time through.

Installed fuel sender with appropriate aviation grade sealant.

Wired according to plans and crimped according to 43.13-1b.


 
Sep 27, 2021     Pilot Side Wing - (2 hours)       Category: Wings
More drilling to final size and deburring.


 
Sep 25, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Leading edge skin work.


 
Sep 09, 2021     Pilot Side Wing - (15 hours)       Category: Wings
Front skins and trailing edge work.


 
Aug 24, 2021     Pilot Side Wing - (3 hours)       Category: Wings
Bottom skin and rear channel riveting.


 
Aug 06, 2021     Pilot Wing - (2.5 hours)       Category: Wings
Working on drilling, deburring, and riveting front ribs. In last picture the main spar attachment for the struts is visible. It was attached with AN-4 bolts and nylon lock nuts per instructions.


 
Aug 04, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Initial skeleton of pilot side wing.


 
Jul 23, 2021     Pilot Wing Skeleton - (2 hours)       Category: Wings
Cleco together the pilot side wing skeleton, attach both front and rear ribs, attach the rear spar and prepare for riveting.


 
May 29, 2021     Wing Root - (3 hours)       Category: Wings
Wing root fabrication and sheet metal install. Required using fluting pliers. Clamp root skin into place. Drill #40 pilot holes into fluted support l-angle and cleco.


 
Apr 19, 2021     Nutplates in Wing Access Panel - (1.5 hours)       Category: Wings
Drilling nutplate holes for fuel tank access panel using standard jig tool.


 
Jan 23, 2021     Passenger Wing - (2.5 hours)       Category: Wings
Finish up riveting bottom skin on passenger wing.


 
Jan 20, 2021     Passenger Wing - (1 hour)       Category: Wings
Preparing to rivet bottom skin of passenger side wing to the skeleton. Beginning the rivet process.


 
Jan 09, 2021     Skin on Wing - (3.5 hours)       Category: Wings
Unpack bottom wing skin for installation. Place skin with clecos. Rivet skin into place in all pre-drilled holes.


 
Jan 08, 2021     Rear Spar Work - (1.7 hours)       Category: Wings
Fastened inboard and outboard rear spar together. A5 rivets in doubler.


 
Dec 06, 2020     Starboard Wing Skeleton Assembly - (2.5 hours)       Category: Wings
Unpacked the wing skeleton from the crate, organized parts and set them aside in order of assembly.

Clecoed wing ribs to main and trailing spar. Checked for level.


 
Dec 05, 2020     Slats and Flaperons - (1.5 hours)       Category: Wings
Installing tips


 
 
Nov 16, 2020     Slats - (1 hour)       Category: Wings


 
Nov 13, 2020     Slats - (6 hours)       Category: Wings
Further assembly of slats. This was a bit trickier than I thought and it didn't come together until I figured out the correct order to attach the clecos.


 
Nov 11, 2020     Slats - (2 hours)       Category: Wings
Attaching the doubler to the slat front top / bottom bend.


 
Nov 10, 2020     Slats - (2 hours)       Category: Wings


 
Oct 30, 2020     Flaperons - (1 hour)       Category: Wings


 
Oct 29, 2020     Flaperons - (1 hour)       Category: Wings


 
NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.